November 4, 2023 Also known as the Rainbow Bridge, a long stone bridge leading to the main gate of
Angkor Wat on the west.
He will preside over the official opening ceremony of the Angkor Wat Bridge.
In order to better manage the flow of visitors to Angkor Wat after the official inauguration, APSARA authorities
will open the main entrance to the visit.
It was revealed that it would be used to determine the destination of Angkor Wat.
Separately, a temporary pontoon bridge at the Angkor Wat temple will be maintained as an exit.
Repairs to the bridge began in 2016 with the cooperation of APSARA authorities and Sophia University in Japan.
Since 1989, Sophia University in Japan has been involved in archaeological and architectural human resources
training, Banteay Kdei temple excavations,
Heritage education program for people and students living around Angkor, Norodom Sihanouk Angkor
APSARA in many activities to support the Angkor site in terms of museum establishment initiatives
We have been cooperating with authorities.
I think it's been more than 8 years since the main gate bridge was built. For visitors coming after November 4th,
It is an opportunity for many tourists and locals to finally walk through the main gate that they have been unable to walk through.^^
Personally, I haven't even been able to walk through the front gate yet. ㅠㅠ